Basic package
€29.99
100 kW included
Essential charging for occasional EV drivers — a cost-effective way to start.
Pricing
You pay only for the kWh you actually take, with no mandatory subscription. For regular drivers, the monthly packages include a fixed amount of energy at a better rate.
Pricing
You pay per kWh for the energy you actually take, with reduced AC rates overnight. No subscription required — or pick a package below for better value.
DC charging
Fast and ultra-fast, up to 300 kW
€0.39 – €0.49
per kWh
AC charging
Up to 22 kW
€0.21 day · €0.19 night
per kWh
Prepay each month and get a fixed amount of energy at a better rate.
Basic package
€29.99
100 kW included
Essential charging for occasional EV drivers — a cost-effective way to start.
Active package
Most popular€59.99
200 kW included
Flexibility and value for regular drivers, with extended usage and extra benefits.
Pro package
€99.99
350 kW included
Plenty of capacity for heavy users who rely on ECHARGE every day.
DC or AC
DC charging is for road trips and short stops, AC charging for long parking. The table below compares speed, recommended battery levels and ideal use cases.
| Feature | DC fast charging | AC charging |
|---|---|---|
| Power | 75 – 480 kW | 7.4 – 22 kW |
| Speed | 20% → 80% in 20 – 30 minutes | Full charge in 4 – 8 hours |
| Recommended battery level | Start below 20%, stop at 80% | Any level, up to 100% |
| Ideal use case | Long trips, short stops, fleets | Home, office, hotels, long-stay parking |
| Connectors | CCS2 (GB/T at some stations) | Type 2 |
| Price per kWh | €0.39 – €0.49 | €0.21 day · €0.19 night |
Frequently asked questions
ECHARGE operates public charging stations in Prishtina, Podujeva, Prizren, Ferizaj and other cities across Kosovo and Albania, at shopping car parks, hotels and fuel stations. The location map on this page shows each station's address, power and real-time availability.
ECHARGE offers AC chargers up to 22 kW for homes, businesses and long-stay parking, and DC fast chargers from 75 kW up to 480 kW for public charging. Available connectors are CCS2, Type 2 and, at some stations, GB/T.
DC charging costs between €0.39 and €0.49 per kWh depending on the station. AC charging costs €0.21 per kWh during the day and €0.19 at night. The Basic, Active and Pro monthly packages include energy at a better rate.
At a DC ultra-fast station of up to 300 kW, most electric cars charge from 20% to 80% in 20 to 30 minutes. On a 22 kW AC charger, a full charge usually takes between 4 and 8 hours depending on the battery.
Download the ECHARGE app for iOS or Android, pick a station on the map, plug in the cable and start the session in two taps. Payment happens in the app by card, and live charging status is shown while you wait.
Yes. Every public ECHARGE station is accessible 24 hours a day, seven days a week, and our support team is available 24/7 on +383 (0)46 21 22 00 and info@echarge-ks.com for any question or issue at a station.
Yes. ECHARGE plans, supplies, installs and maintains charging infrastructure for businesses, hotels, residential buildings and fleets across Kosovo and Albania, from the site survey and grid sizing through to commissioning and service.